CHANGXUN | Valve Test Equipment

Home / Valve Test Benches / Single or dual station

One station or two? What a second valve test station actually buys

Short answer: it depends which kind of "two" you are being quoted. Two stations on one frame usually buy a second size range and less floor space — the hydraulic power unit is shared, so the valves still run one at a time. Two stations that test at the same moment buy throughput, and those only exist where the circuits are independent and the sequence is automatic. Station count is a layout decision, and your order book makes it — not the brochure.

One frame, two size bandsShared power unitSimultaneous needs separate circuitsCycle time, not tonnage

Get a quotation  Send your valve list

Quick answer

What a second station usually addsA second size band or a second fixture set, on the same frame
What it usually does not addDouble output, where one power unit feeds both stations
What does double outputTwo independent circuits testing at once, with automatic sequencing
What never changesThe pressure envelope. It is mechanical, not a setting
What decides itValves per shift, size bands, and how often you change plates

Three different things are sold as "two stations"

The phrase appears in three quite different machines, and the difference is not cosmetic. It changes what the second station does for you, and it changes what you have to feed it: floor space, fixtures, gauges, operator attention and maintenance.

LayoutWhat the second position buysWhere it shows up
A. One station, several plate sets. A single clamping position, and the size range comes from interchangeable sealing plates and adapters.Nothing in throughput. It buys the widest range from one frame, at the cost of a plate change whenever the size band moves.Most single-frame benches, from DN15–DN150 up to DN50–DN600.
B. Two stations, one frame, one power unit. Two clamping positions side by side, each with its own plate set, fed by a single hydraulic pack.A second size band without a second frame — and no plate change when the order book jumps from DN200 to DN600. In the standard configuration the valves run one after the other, not together.SYJ2-300-600 (DN50–DN300 / DN350–DN600, PN6–PN100) and DFS2-600 (same split, 0–7 MPa, grip and top clamping).
C. Two stations testing at the same time. Independent clamping and pressure circuits, automatic sequence, one valve reloaded while the other is still under test.Throughput. The hydraulic and pneumatic circuits stay busy instead of waiting between valves, which is the whole point of a line.ZZC2-200 automatic gate valve line, DN50–DN200, up to 5 MPa, two valves clamped and tested together.

If a quotation says "two stations" and nothing else, ask which of the three it is. It is the single most useful question in the conversation, and it costs one email.

Why a shared power unit means one valve at a time

A hydraulic bench is not limited by its cylinders. It is limited by flow. The pump delivers a fixed volume per minute, and the pressure in a closed volume rises at a rate set by that volume: a DN600 body with its plate set takes far more water to reach 10 MPa than a DN80 body does. Two stations drawing from the same pack at the same moment split the available flow between them, so both rise more slowly — and the clamping cylinders draw from that same pack, which is why the interlock has to know which station is pressurised.

That is why the SYJ2-300-600 is described as one power unit serving both stations, and why its own documentation says the two positions are used one at a time. The gain is range and floor space. If what you need is parallel testing, the machine has to be specified for parallel testing: separate circuits, flow sized for two simultaneous fills, and a control layer that runs two sequences without confusing the two records.

The gain that is real: no plate change when the size band moves

On a single-frame bench, changing from a DN150 butterfly valve to a DN500 one costs the unclamp, the plate swap, the seal inspection, the re-alignment, the re-clamp and the re-fill before the first useful minute of the next test. None of that appears in a cycle time. It appears in the shift, and in how willingly an operator takes the big valve job at four in the afternoon.

A two-position frame with the split at DN300/DN350 deletes that operation for the whole large band: the DN500 valve goes straight onto the position that is already set up for it. If your order book alternates between a run of small valves and the occasional large body — which is the normal shape of a valve workshop — this is the argument that pays, and it pays in changeovers rather than in cycle time.

Count it before you believe it

Walk to the bench and time one changeover, from unclamp to the first drop of water in the next valve. Then count how many times a day it happens. Multiply. That number, not the test cycle, is what a second position removes, and it is the number to put next to the price difference. On a bench that runs one size for a whole shift, it is near zero and the second station is dead weight.

Throughput arithmetic you can run on your own numbers

Throughput is not a property of the machine, it is a property of your valve and your hold time. One station delivers 60 divided by the full cycle in minutes. A simultaneously testing pair delivers twice that, minus whatever the operator loses loading the next valve. Write your cycle down as clamp, fill, pressurise, hold, read, drain, unclamp, and use your own hold time from the standard on the order.

Full cycle per valve1 station, per hour1 station, per 8 h2 simultaneous, per hour2 simultaneous, per 8 h
3 min2016040320
5 min129624192
8 min7.56015120
12 min5401080
20 min324648

This is arithmetic, not a measured cycle time from our floor. Your numbers will be worse: breaks, plate changes, rejects and a valve that has to be re-clamped all take time out of the shift, and the second column of a two-position shared-pack machine is the same as the first, not the fourth.

Worked example, so the arithmetic is visible: a 7.25 hour effective shift at an 8 minute cycle gives 435 ÷ 8 = 54 valves on one station. The same shift on a simultaneous pair gives 108, and that is the upper bound — it assumes the operator can load and unload inside the other station's cycle, which is true for small valves and not true for a DN600 body that arrives on a trolley and needs a hoist.

One station, wider range — the quieter option

There is a third way to buy range that does not involve a second station at all: one frame with a full plate set and the patience to change it. A single DN50–DN600 bench covers the same population as a split frame; it just pays for the coverage in changeovers instead of capital. For a workshop that runs one size band for days at a time, this is the correct answer and a second position would sit idle.

Where it stops working is the mixed order book: twenty DN80 valves, then two DN500, then fifteen DN100. The changeover count explodes, the large valves get pushed to the end of the week, and eventually somebody quotes the DN500 job as "outsourced". That pattern is the honest signal that the second position is worth its floor space.

What the station count changes in the specification

The frame is only part of it. Every line below has to be bought, wired, calibrated or maintained per position, and it is the part quotations tend to leave implicit.

Item1 station2 stations, shared pack2 stations, simultaneous
Sealing plate sets and adaptersOne set, sized to the rangeOne set per position, sized to its bandOne set per position
Clamping cylinders and forceOne clamp sized for the largest bodyEach position sized for its own bandEach position sized for its own band
Pressure indicationOne gauge or transducerOne per position, so the record names the valveOne per position, read independently
Test recordOne record per valveOne record per valve, tagged with the positionTwo records open at once
Hydraulic power unitOneOne, shared — which is the cost saving and the throughput limitFlow sized for two simultaneous fills
Floor spaceOne footprintOne frame, wider; no second footprintOne frame plus loading room on both sides
OperatorOne, fully occupiedOne, plus changeover time savedOne if the cycle is long, two if it is short
Maintenance and calibrationOne gauge, one seal setTwo of eachTwo of each, two sequences to validate

Station count across the range

For reference, this is how the two-position frames sit against the single-position ones. Pressure figures are the water test envelope of the standard configuration; where an air circuit exists it is noted separately, because a second station never raises either envelope.

ModelStationsSize rangeWater test pressureClamping
SYJ-1501DN15–DN1500–40 MPa30 t
ZSYJ-300A1DN50–DN3001.6–40 MPa80 t, vertical
YSYJ-3001DN50–DN4000–40 MPa, air 0.8 MPa80 t, top
SYJ-600SQ1DN50–DN6000–40 MPa, air up to 4 MPa90 t
SYJ-600M1DN350–DN6000–10 MPa126 t, vertical
WBD-6001DN50–DN6000–16 MPa150 t, horizontal
SYJ2-300-6002, sequentialDN50–DN300 / DN350–DN600PN6–PN100Per position, shared pack
DFS2-6002DN50–DN300 / DN350–DN6000–7 MPaGrip 80 t / 126 t, top 60 t / 80 t
ZZC2-2002, simultaneousDN50–DN200, gate valvesUp to 5 MPaAutomatic line, PLC sequence

Ranges and clamping forces above are the standard configuration of each model. Size range, clamping force, control level and voltage can be adapted — the exact configuration is confirmed in writing on the quotation, not from this table. See the bench overview for the full comparison, and the buyer guide for how tonnage relates to bore and pressure.

Four steps that decide it from your own order book

  1. Count valves per shift, by size band. Two months of production or repair orders is enough. If one band is more than about three quarters of the volume and the rest is occasional, you are buying range, not throughput.
  2. Time one real cycle on the bench you have, including clamp, fill, hold, read and drain. Multiply by your volume. If the answer already fits the shift with room to spare, a second station adds nothing.
  3. Time one changeover and count them per day. This is the number that a two-position frame with a split at DN300/DN350 removes, and it is often larger than people expect.
  4. Check floor and people. A simultaneous pair needs loading room on both sides and, at short cycles, a second pair of hands. A shared-pack frame needs the width of one frame and nothing else.

If steps 1 to 3 say the demand is broad and thin, the right purchase is a single frame with a complete plate set. If they say the demand is heavy and narrow, it is a simultaneous line. The shared-pack two-position frame sits between them and is the usual answer for a workshop with a mixed book — which is why it exists.

Boundaries worth writing down

A second station does not extend the pressure envelope. The frame, the cylinders and the seals are sized for a pressure class. Two positions on a 7 MPa machine are still 7 MPa; the envelope moves only by specifying a different machine.

Shared hydraulics means sequential use. Where one power unit serves both positions, expect to test one valve at a time. Any quotation that implies otherwise should be asked to show the circuit.

Simultaneous is a specification, not a feature. Parallel testing requires independent circuits, flow sized for two fills, and a control layer that keeps two records apart. It is bought, not enabled.

The station count does not decide pass or fail. The bench produces pressure, time and a leakage observation per valve. Whether a valve is accepted is decided by your quality function against the standard on the order — see choosing a bench by test standard.

No cycle time is promised here. The only cycle that matters is the one measured on your valve, at your hold time, with your operator.

Where this question sits among the others

Station count is one of four layout decisions, and it is usually the last one. The layout itself — horizontal or vertical — follows how the valve is loaded, and that is covered in horizontal versus vertical. The size band decides the daylight and the plate set, covered in selection by DN. The fixture decides whether the reading means anything, covered in clamping methods. Once those three are fixed, the station count is arithmetic on your order book.

Two related questions come up at the same time. If the valves are large and the pressure is low, the limit is usually the flange diameter rather than the tonnage — the pressure chart carries the class-to-test-pressure arithmetic. And if the second station exists to serve a customer who wants a record per valve, the record format matters as much as the position: see records and pressure curves and leakage rate classes.

What to send us

Six lines settle it, and without them any recommendation is a guess about somebody else's workshop:

Send that and the reply is a model, a position layout and a plate set per position — with a plain statement of what the second position will and will not do for your numbers.

Frequently asked questions

Does a two-station bench double my output?

Only if the two stations test at the same time on independent circuits. Where one hydraulic power unit feeds both positions — the usual arrangement on a two-position frame — the valves run one at a time, and the second position buys a second size band and the changeover time you no longer spend. That is a real gain on a mixed order book and it is not double output. Ask which arrangement is being quoted before comparing prices per station.

Can a second station be added to a bench I already own?

Sometimes, and it is a frame question before it is a hydraulic one. The check list is the column spacing and the frame stiffness at the larger size, whether a second plate set and clamp can be mounted without crowding the first, whether the existing pump has the flow for a larger fill volume, and whether the control cabinet has the inputs and the recipe memory for a second position. We answer that from photographs, the nameplate and the plate-set list rather than from a catalogue.

Is a two-position frame cheaper than two separate benches?

It is almost always smaller on the floor and it carries one power unit instead of two, which is where the saving comes from. It is not automatically cheaper per testing position, because each position still needs its own plate set, its own clamp sizing and its own pressure indication. We do not quote from a web page — the comparison is made per enquiry, against your actual size split.

How do I choose where the split between the two positions falls?

Put it where your order book splits, not where the catalogue rounds. The two-position frames in our range divide at DN300/DN350 because that is where handling changes: below it a valve can be lifted by hand or with a small hoist, above it a DN600 body arrives on a trolley. If your volume is concentrated below DN200, a split at DN300 wastes the large position; say so and the frame is specified with a different division.

Does each station need its own gauge and its own record?

Yes, if the record is going to a customer. A gauge shared between two positions leaves the record ambiguous about which valve was under pressure at the moment of the reading, and an auditor is entitled to ask. Each position gets its own indication and its own record, tagged with the position, and the export carries that tag — the data export page describes the fields.

Can the second position run a different test than the first?

It can hold a different valve, a different plate set and a different recipe, which is the point on a mixed order book. What it cannot do is run a test outside the machine's pressure and size envelope. If the two bands need different pressure classes — say PN16 on the small position and PN100 on the large one — the machine is specified for the higher class, and the low-range indication has to be sized so the small valves are still readable; the standard page covers that gauge problem.

Send the valve count by size band.

Valves per shift, DN range, pressure classes and your measured cycle. We come back with the position layout, the plate set per position, and a straight answer on whether the second position earns its floor space in your workshop.

Get a quotation