CHANGXUN | Valve Test Equipment

Home / Valve test benches / Valve test data export

Valve test data export: what comes off the bench, in which file, on which media

A valve test bench can export one record per valve as CSV and PDF — pressure against time, both gauge ranges, clamp pressure, valve ID, operator and timestamp — to a USB stick or a folder on your network. It records what the machine did. It does not decide whether the valve passed: that judgement belongs to the standard and the inspector.

CSV + PDF per valveUSB or plant folderERP import readyRetrofit or new bench

Send the model and the report your customer asks for  Email the bench model + required fields

Quick answer

ExportsCSV summary, CSV raw curve, A4 PDF per valve
Goes toUSB stick, plant network folder, ERP drop folder
ReadsTwo pressure ranges + clamp pressure + clock
Needs on the benchController with spare I/O, gauges with an output
DowntimeCabinet and commissioning window, fixed after survey
Accepted on30 consecutive valves, all fields, re-imported by you

Why the record is the part your customer audits

Most arguments about a valve are not about whether it was tested, but about what the test actually was. A handwritten sheet says 1.5 × PN and leaves out which gauge was read, whether the hold was timed or estimated, and what the pressure did during the hold. The inspector asks for the curve, the sheet has a number, and the discussion moves from the valve to the paperwork. That is the failure mode this page is about, and it is not solved by a bigger pump.

Two pressure ranges matter more than they look. A 0–40 MPa dial read down at a 0.6 MPa seat test is being asked for a value it cannot resolve, which is why benching practice separates the ranges — the same reason the pressure chart gives shell and seat figures separately, at 1.5 × and 1.1 × the cold working pressure. A record that shows one coarse number for both tests has thrown away the distinction the standard is built on.

Three situations bring buyers to this page, and they are all about evidence rather than automation:

What is actually in the file, field by field

This is the list to argue about before anything is built, because it is the only part of the project that is hard to change later. Each field is either measured, taken from the recipe, or entered by the operator — and the record should say which.

FieldWhere it comes fromUnit / form
Valve identificationOperator entry, or barcode scan where a scanner is fittedText, free format agreed with you
Valve type, DN, pressure classThe recipe selected before the testText, e.g. gate · DN100 · PN16
Test typeThe sequence in the recipe: shell, seat, back seatText
MediumRecipe, confirmed by the circuit in useWater or air
Shell test pressureHigh-range transmitterMPa (bar available on request)
Seat test pressureLow-range transmitterMPa
Pressure against timeBoth transmitters, sampled through the holdMPa vs s, sampling interval set at commissioning
Hold timeController timer, started when the pressure is reacheds
Clamp pressureClamp circuit sensorMPa
Gauge readings, each rangeDigital gauges or the transmitters, whichever is the indicated valueMPa
Limit and result flagOperator enters the limit from the standard; the flag records pass or fail as judgedText
OperatorLogin at the HMI, or entry where there is no loginText
Timestamp, start and endController clockISO 8601 date and time

Two of those fields are the ones inspectors ask about first: the sampling interval behind the curve, and whether the clamp pressure was actually reached. Both are logged per test rather than assumed, and both appear on the acceptance record described below.

Three export routes, and which one fits your plant

Export is not one product either. The difference between the routes is not the software, it is who owns the file and what happens when the network is down.

RouteHow it worksFitsWhat it costs you in practice
USB stickOperator plugs in at the end of a shift or a batch; the bench writes one folder per dayA bench with no network, or a workshop that keeps records off the plant systemThe stick is the only copy until somebody copies it. A backup routine has to exist, and it is part of the handover.
Plant folderEach test writes its files to a shared folder over the LAN, named by model, serial, valve ID and timeA bench on the plant network with an IT contact and a backup already runningNeeds an IP, a service account and a share that will not be re-organised without telling anyone.
ERP / QMS dropCSV written into a folder your system watches, or values published over Modbus TCP or OPC UA where the controller supports itA plant that already imports test results, or is about toThe import specification is the work: field order, units, delimiter, encoding and which row is the key.

On the third route, a word of order: the bench side can be made to produce almost any reasonable CSV, but it cannot guess what your ERP expects. The survey collects the target system's import sheet, one real imported file from another supplier if one exists, and the field names your QA uses. Without those three, the export is built on an assumption and the assumption is discovered at the first import.

Formats, naming and what an auditor can re-open years later

Three files are produced per test, and they answer three different questions: what happened (PDF), what are the numbers (summary CSV), and what did the pressure actually do (raw CSV).

File naming follows a pattern fixed at commissioning, of the form model_serial_valveID_YYYY-MM-DD_hhmm, so a folder sorts itself by machine and by date and a file can be found from a delivery note without opening it. Delimiter, decimal separator, date format and encoding are set at the same time: a European Excel locale expects semicolons and commas inverted, and getting that wrong is the most common reason an import fails on the first day.

Two practical points on longevity, because a record has to outlive the machine. First, CSV and PDF are chosen precisely because they need no licence to open — a proprietary historian database is a liability ten years later. Second, the raw curve is kept alongside the summary rather than only inside the PDF, because the PDF image cannot be re-analysed and the CSV can.

Which benches can export, and what each one needs

The envelope does not change with this work: it adds instruments and a report layer to a machine whose frame, plates, pump and clamping force stay as they are. What changes per model is where the export pays first, which is usually decided by how many ranges are read on a normal test.

ModelEnvelope as builtExport scope that fitsWhy
SYJ-150DN15–DN150 · 0–40 MPa · 30 tTwo ranges + summary and PDFSmall bore at high pressure: shell and seat sit far apart on the scale, so two ranges are read on nearly every test
ZSYJ-300ADN50–DN300 · 1.6–40 MPa · 80 tRecipe-driven fields + exportMany sizes and classes on one bench: the record is only trustworthy if the recipe, not the operator, set the pressures
YSYJ-300DN50–DN400 · water 40 MPa / air 0.8 MPa · 80 tTwo media channels, separate filesWater and air are measured on different ranges and judged by different limits; one channel cannot serve both
WBD-600DN50–DN600 · 0–16 MPa · 150 tClamp pressure logged + exportAt 150 t the clamp is the step that decides whether the reading means anything, so it is recorded per test
SYJ-600SQDN50–DN600 · 40 MPa water / 4 MPa air · 90 tSequence per valve type + exportTwo media and a wide size range: the sequence is worth encoding once and then recording, not re-deciding per valve
SYJ-600MDN350–DN600 · 0–10 MPa · 126 tLow-range emphasis + exportLarge valves at a modest class: the seat test is the discriminating one, so the low range is the one to protect
SYJ2-300-600DN50–DN300 + DN350–DN600 · PN6–PN100Per-station records, one file eachTwo stations, two size bands: the files have to say which station produced the test
DFS2-600DN50–DN300 + DN350–DN600 · 0–7 MPa · grip 80 / 126 tClamp + exportGrips rather than blind plates: the logged clamp pressure is the only witness of how the jaw seated
ZZC2-200DN50–DN200 · PN5 · two-station automaticReport layer on an existing lineThe line already cycles automatically; what is usually missing is the file per valve and a programme that can be restored

Envelope figures are the catalogue values for each model; a machine built to a customer's own range differs, which is why the nameplate and the drawings are part of the survey. The full specifications sit on the bench overview, and the fixture that decides the reading is covered under clamping methods.

Before and after, at the record step only

The left column is a bench that tests correctly and documents badly. The right column is the same machine with the export layer added. Nothing else in the cycle moves.

StepBeforeAfter
Identify the valveWritten on the sheet at the end, sometimes from the delivery noteEntered or scanned before the test; the file carries it
Set the pressuresLooked up, dialled in, rememberedFrom the recipe; the recipe ID is in the file
HoldTimed on a wall clock, peak noted by eyeTimed by the controller, pressure sampled through the hold
JudgeCompared against a limit on a wall chartLimit entered from the standard; the file shows measured against limit, and who judged
Write it upPad during the shift, spreadsheet at the end, from memoryThree files written when the test ends, no retyping
Send to the customerPhotocopy, or a PDF typed from the sheetThe A4 PDF, with the curve on it
Find it againBy shift, by pad, by who was on the benchBy serial and valve ID from the file name
Change an entryCrossed out and initialled, or quietly retypedCorrection as a separate line with a reason where the audit trail is fitted

What this does not do. It does not judge pass or fail, and it does not issue a certificate — your QA signs against the standard, and the file is the evidence behind that signature. It does not calibrate anything: transmitters and digital gauges carry their own calibration certificates, and the record is only as good as those. It is not an electronic signature system; if your customer's quality regime requires a regulated audit trail, that is a different scope and should be raised at the survey. And it does not become more accurate because it is digital — a bench with a bowed platen or a leaking seal produces a beautifully formatted wrong number, which is why the mechanical checks come first.

Delivery list

What a handover contains, in the order the acceptance run uses it:

Schedule, and the window the bench is stopped

Export work runs in two stages, and the second cannot be dated before the first is complete. Stage one is the survey: which controller, how many spare inputs, what the gauges are, whether the clamp is sensed, what the ERP expects, and which fields QA signs off. Stage two is build and commission: programme, template, naming and the destination folder are prepared while the bench keeps running; the changeover is the cabinet work plus the commissioning run.

No number of days is published here, deliberately. The window depends on whether the gauges already have an output or have to be replaced, whether the cabinet has spare I/O or needs a module, and whether the plant's IT will open a folder without a three-week ticket. Those three are only known after the survey, and a date quoted before it is a guess that turns into an overrun.

Where the work is done matters for production too: on a single-bench plant the honest statement is that the bench is unavailable for the changeover window, agreed around a delivery date rather than announced. A plant with two benches has the work sequenced onto the second one. Most of the export project does not need the machine at all — but commissioning does, because the record has to be produced from a real valve at a real pressure.

Acceptance: six checks, all of them measured

Acceptance is a run of 30 consecutive valves of the kind the plant actually tests. The point is not that files appear; it is that your QA and your IT can both use them without touching them.

What is checkedHowWhat the record shows
1. Record completeness30 tests, counting the files produced without manual entryHow many of 30, and which step broke where it was not 30
2. Field completenessEvery field on the agreed list, checked on all 30 filesA missing field is named, not summarised as “minor”
3. ClockController clock compared with a reference at the start and end of the runThe offset and the drift over the run
4. Value agreementHMI value, CSV value and PDF value compared at three points on each rangeDeviation at each point, with the master gauge certificate number
5. Re-importYour QA or IT imports the CSV into the real target — template, ERP or QMSImported without manual editing, or the exact reason it did not
6. Retrieval after power cycleA record written before a power cycle is opened after itPass or fail, and whether the archive index survived

The pressures behind those tests come from the class the valve is sold to, at 1.5 × CWP for shell and 1.1 × CWP for seat on the pressure chart, with leakage allowances from the leakage rate classes. What the machine has to sequence is the eight-step hydrostatic procedure, and the shape of the curve the record has to capture is on the test record page. If a customer's witness test is involved, the FAT checklist is the same list from the buyer's side.

Small bore, high class

  • SYJ-150 · DN15–DN150
  • 0–40 MPa · 30 t
View SYJ-150 →

General repair shop

  • ZSYJ-300A · DN50–DN300
  • 1.6–40 MPa · 80 t
View ZSYJ-300A →

Water and air on one bench

  • YSYJ-300 · DN50–DN400
  • water 40 MPa / air 0.8 MPa
View YSYJ-300 →

An older machine?

  • Control layer, modules
  • frame and envelope unchanged
Retrofit scope →

Questions about test data export

Can my existing bench export test data, or do I need a new machine?

Most benches with a controller can. The four things needed are spare inputs on the controller, pressure transmitters or digital gauges with an output, a report template and somewhere for the file to go. Dial gauges are replaced or have transmitters teed in; a relay-logic panel is replaced rather than programmed. The frame, plates, pump and clamping force do not change.

What exactly arrives in the folder after a test?

Three files: a summary CSV with one row per valve, a raw CSV with one row per sample for re-plotting, and a one-page A4 PDF with the header fields and the curve. Naming is fixed at commissioning, of the form model_serial_valveID_date_time, so a folder sorts itself by machine and by date.

Can it write straight into our ERP?

Usually through a watched folder that your ERP or QMS imports from, or over Modbus TCP or OPC UA where the controller supports it. What decides it is your import specification — field order, units, delimiter, encoding and the key row. That is collected at the survey, along with one real file your system has already accepted from another supplier.

Does the exported record replace a test certificate?

No. It is the measured evidence — pressures, hold, both ranges, clamp pressure, identification, operator, timestamp. The certificate is signed by your QA against the standard the valve is sold to, such as API 598, API 6D, GB/T 13927-2022, ISO 5208 or EN 12266-1. The file is what sits behind that signature.

Can someone edit a record after the fact?

The record is written when the test ends. With the audit-trail option a correction is written as a separate line with a reason and the original kept, so the file shows both. Without it, the file is a plain record. If your customer requires electronic signatures or a regulated trail, raise it at the survey — that is a different scope from a CSV export.

How much of the machine has to stop for the work?

The build happens off the machine: programme, template, naming rules and the destination folder. The bench is stopped for the cabinet work and the commissioning run, in one window fixed after the survey. A plant with two benches has the work sequenced onto the second one so a test line stays available.

Send the bench model and the report your customer asks for

Tell us the machine — ours or another make — the valve sizes and classes you test, and one sample of the report a customer or inspector has asked you for. We come back within 48 hours with the field list, the export route that fits, and what the existing cabinet can and cannot support.

Request an export scope