Home / Valve Test Benches / Price and lead time
Valve test bench price and lead time: what moves them
Short answer: the quotation is a configuration, not a number, and the lead time starts when that configuration freezes. Two benches with the same DN range can differ by pressure class, air circuit, automation level and record level — which is why no catalogue price belongs on a web page. What this page does instead is show you the structure of the quotation line by line, the choices that move it, and what actually sets the delivery date, so the number you eventually receive is no surprise.
Quick answer
| Where the price lives | In a written quotation per configuration — never as a web number |
|---|---|
| What moves it most | Size band and clamping tonnage, then pressure class, automation and records |
| What a proper quotation lists | Machine, fixtures, indication, records, FAT, spares, packing, commissioning — line by line |
| What sets the lead time | Configuration survey and freeze, then build, FAT and shipment |
| What never moves after order | The pressure envelope. It is mechanical, not a setting |
Why there is no price list on this site
A valve test bench is not a catalogue item with a tag. It is a frame, a hydraulic power unit, a set of sealing plates, a clamping system, a level of control and a way of recording results, assembled against a specific valve population. Take two workshops that both test DN50–DN300 flanged valves: one works to PN16 on water with a paper record sheet, the other works to PN100 with an air seat test and a CSV export for its customer audits. The second machine carries a bigger frame, a second pressure band, a low-range secondary gauge, a PLC with recipes and a data route — and the two quotations differ for reasons that no single published number can carry. If that smaller machine is what your valve population actually needs, the small-workshop guide walks the first-bench decision separately.
A published price can only be wrong in one of two directions. If it is set low to look competitive, the machine that actually answers the enquiry costs more and the quotation reads as a betrayal. If it is set high to be safe, it hides the smaller machine that was the right answer all along. Neither direction helps a buyer decide, so the number is reserved for the document that follows the survey: the quotation itself. The structure of that document, however, is not a secret, and it is the next section.
What a proper quotation contains, line by line
Whatever supplier you buy from, a quotation you can sign should settle every line below. If a line is missing, ask for it — the cost of a line discovered after delivery is always larger than the cost of the line itself.
| Line | What it states | What to check before signing |
|---|---|---|
| Model and configuration | The machine, its frame layout and the options fitted, named exactly as they will appear on the nameplate | That the model matches the discussion, not "or similar" |
| Pressure envelope | The water test pressure band and, where an air circuit is fitted, the air pressure — as ranges, e.g. up to 40 MPa on small bores, dual gauges | That your largest class sits inside the envelope with margin, per the pressure chart |
| Size range and fixtures | The DN band, the number of plate sets and adapters, and which sub-bands each set covers | That the bands on your order book each have a plate set, per selection by DN |
| Clamping | Clamping method (blind plate, end grip, top jaw) and the force, with the bore class it is sized for | That the method matches your valve population, per clamping methods |
| Control level | Manual, semi-automatic or PLC with recipes, and how many recipes are configured | That the recipe count covers your frequent valve types |
| Pressure indication | Gauges and transducers, including any low-range secondary gauge for small-bore readability | That small valves on a big machine remain readable, per choosing by standard |
| Records | Manual record sheet, or CSV/PDF export, and the route the data takes — what is and is not automatic | That the record satisfies your customer audits, per the data export page |
| Factory acceptance test | What is demonstrated at the works before shipment, and whether a witness is included | That the FAT covers the envelope, both gauges and the safety interlocks |
| Spares and wear parts | Which seals, plates and fittings ship with the machine as the first wear-part box | That the list matches the wear points, per the spare parts page |
| Documentation | Manuals, wiring diagrams, gauge certificates, packing list — and the languages they come in | That the record sheet language matches what your customer accepts |
| Packing and shipment | Packing method, shipping terms, and who books the freight | That the machine fits the door and the floor you have prepared |
| Commissioning and training | What is included at start-up — gauge checks, dry run, first valves — and what is quoted separately | That the split is written down, not assumed |
Twelve lines is a complete quotation. A one-number quotation is not necessarily dishonest, but every one of the twelve lines it left out will be negotiated again at delivery, from a weaker position.
Which choices move the quotation
Nothing below is a price. It is the direction of travel, so you can see which of your requirements carries weight before the number arrives.
| Choice | Effect on the quotation | Why |
|---|---|---|
| Wider size band | Raises | Frame opening, plate diameter and clamping force all follow the largest bore — a DN600 body needs a different frame from a DN150 one |
| Higher pressure class | Raises | Wall thickness, pump stage, fittings and safety provisions are sized for the envelope; PN100 is a different hydraulic machine from PN16 |
| Air seat test circuit | Raises | A separate pneumatic line with its own regulator, indication and interlock; sized per the 1.1× seat test ratio |
| Automation level | Raises | PLC with recipes, sequencing and safety loop costs more than manual valves and gauges — and repays itself in record consistency, not in speed |
| Exportable records | Raises | Sensors, data capture and export routes ride on the automated layer; see the data export page |
| More plate sets | Raises, per set | Each sub-band of DN needs its own sealing plates; the number follows your order book, not the catalogue |
| Simultaneous stations | Raises | Independent circuits, flow for two fills and a control layer that keeps two records apart — see single versus dual station |
| Voltage and frequency | Minor, listed | The pump motor and control supply follow the destination grid; it is a line on the quotation, rarely a decision |
The pattern worth noticing: three of the eight drivers are records and control, not pressure. That is because the machine that produces pressure is older technology than the machine that proves it, and the second one is where quotations differ most between suppliers. The buyer guide walks the whole decision in order.
What actually sets the lead time
Lead time is not a warehouse pick. It runs in two stages, and knowing where you are in them is the only honest way to ask "how long".
Stage 1: survey and configuration freeze
The survey turns the enquiry into a signed configuration. It uses what you send: valve types, DN bands, pressure classes, the standard on the order, the record your customer accepts, the floor and the power supply. It ends when the quotation is signed and the configuration freezes. Everything after that point is a change request, with its own quotation line and its own delay — which is why the standard page and the DN selection deserve attention before you sign, not after.
Stage 2: build, FAT, shipment
After the freeze, the duration is set by four things, in roughly this order of weight:
| Driver | Why it takes time | What you can do about it |
|---|---|---|
| Fixture count | Plate sets and adapters are machined to the DN bands; more bands, more machining | Split the plate sets into first-delivery and follow-up if one band is urgent |
| PLC configuration | Recipes, sequence logic and the safety loop are written and tested against the agreed configuration | Agree the recipe list at the survey, not at commissioning |
| Factory acceptance test | The machine runs against its own quotation lines; if a witness attends, dates are coordinated | Decide early whether to witness, or accept a recorded FAT |
| Shipment | Packing, inland transport, ocean freight and customs follow the destination | Confirm the site is ready — power, water, drain, floor — before the machine leaves |
No general lead time is published on this page, because a duration promised to everyone is accurate to nobody. The duration for your order is written on the quotation, per order, where it can be held to.
Two related cases run on their own clocks. A retrofit starts from surveying your machine and is scheduled around your shutdown window, so its lead time is quoted per job. Wear parts from the spares page ship separately from machines and are the fastest-moving line in the whole system.
How to get an accurate quotation quickly
Every missing line in the enquiry becomes a conservative assumption in the quotation, and conservative assumptions all point the same way. Seven lines get the quotation close on the first pass:
- Valve types — gate, globe, check, ball, butterfly, safety, in any mix
- The DN range, smallest and largest, and which band carries most of the volume
- The pressure classes, smallest and largest, as PN or as Class
- The test standard written on your orders — API 598, API 6D, ISO 5208, EN 12266-1, GB/T 13927-2022
- The record your customer accepts — paper sheet, CSV, PDF — and in which language
- The automation level you expect, if you have an opinion on it
- Destination and power supply, since the pump and control voltage follow them
If you are replacing an existing bench, the nameplate and a photograph of the old machine answer half of these in one attachment. If the valves are unusual — long-neck gate valves, knife gates, check valves with unusual faces — say so in the first message, because the fixture, not the pump, is what such valves change.
What is fixed after the order is signed
The configuration freezes at signature, and one item in it is not a configuration at all but a physical fact: the pressure envelope. Frame, cylinders and seals are sized for a pressure class, and no option, retrofit or software setting extends it afterwards — that is the boundary the whole site keeps repeating because it is the most expensive one to discover late. The used and refurbished page states the same boundary from the other side: a machine's envelope is what it was built with, whatever the listing says.
Other items can move before the build freeze. A recipe added to the PLC, an extra plate set, a change of record format — each is a change request with its own quotation line, and each is cheaper to agree before machining starts than after. This is the practical reason the survey stage exists, and the reason the enquiry list above is worth filling out carefully: it is not paperwork, it is the cheapest point in the whole project to change your mind.
Delivery and acceptance, stage by stage
The quotation settles what is delivered; this is the order the delivery itself follows, and what to verify at each step.
| Stage | What you receive | What to verify |
|---|---|---|
| Before shipment | The factory acceptance test against the quotation lines: envelope, both gauges, interlocks, record output — witnessed or recorded, as agreed | That the FAT report names the quotation lines it covers, and the results are per the machine's own envelope |
| Packing | The machine, the plate sets and adapters, the first wear-part box, manuals and wiring diagrams | The packing list against the quotation's fixture and spares lines, before the forwarder leaves |
| Arrival | The machine on your floor — for which the space, power, water and drain should already be prepared | Forklift or crane access, floor level, and the connection points against the wiring diagram |
| Commissioning | Gauge checks against reference instruments, a dry run, and the first valves taken through the full cycle | Both gauges agree, interlocks stop the pressurisation, the record sheet or export fills itself as agreed |
| Handover | Operator training, the record templates, the spares register, and the contact route for support | Your operators run a full cycle unaided, and the wear-part register matches the spares page lists |
After handover, two support routes exist without shipping anything: the remote diagnostics service for control and data questions, and the wear-part rotation from the spares page for the seals that do the daily work. Neither changes the envelope, and neither is a substitute for the gauge calibration your own quality system schedules.
Boundaries worth writing down
No prices appear on this page, by design. The number comes only from a written quotation, per configuration. Any figure quoted in chat, on a listing or over the phone is a guess wearing a shirt and tie.
No lead time is promised on a web page. The duration for your order is written on the quotation, per order, where it can be held to. A general number would be accurate to nobody.
The envelope cannot change after the order. Frame, cylinders and seals are sized for a pressure class. Everything else is negotiable before the build freeze; the envelope is not negotiable at all.
A quotation prices the machine, not the verdict. The bench produces pressure, time and a leakage observation. Whether a valve passes is decided by your quality function against the standard on the order.
This page is not the quotation. The signed document, with its twelve lines, is the only thing that counts.
Where this sits among the other decisions
Price and lead time are the last questions, and they inherit everything decided before them. The size band and the fixtures come from selection by DN, the class margins from the pressure chart, the standard's hold times and acceptance grades from choosing by standard and the leakage rate classes. If the record will be audited, the record and pressure curve page explains what the export has to carry. And if the question is really "new bench or fix the old one", the retrofit and second-hand pages cover the alternatives before a new quotation is written.
The full model range, with each machine's envelope and station count, sits on the bench overview; short answers to general questions are on the FAQ. And before two quotations from different suppliers are compared, the ten supplier checks put them on the same footing — envelope at your largest DN, gauge ranges, documents, program ownership. Two machines sold under the same bench, stand or rig name are only comparable once those figures match.
Frequently asked questions
How much does a valve test bench cost?
It depends on the configuration: size band and clamping tonnage, pressure class, whether an air circuit is fitted, the level of automation, the record level and the number of plate sets. That is why there is no catalogue price here — two benches with the same DN range can differ in every one of those items. The number comes from a written quotation against your valve list, and the quotation states what is included line by line, so the comparison with any other supplier's quotation is line against line.
What information gets an accurate quotation?
Seven lines: valve types, the DN range with the bands that carry the volume, the pressure classes, the standard written on your orders, the record format your customer accepts, the automation level you expect, and the destination with its power supply. A photograph of the old bench you are replacing answers several of them at once. With those lines the reply is a model, a fixture package and a quotation structured like the one on this page — not a single number with nothing behind it.
How long does a valve test bench take to build and deliver?
In two stages: the configuration survey and freeze, then build, factory acceptance test and shipment. What each stage takes is written on the quotation for the specific order, because fixture count, PLC recipe count and FAT scheduling differ per configuration. No general lead time is published on this page — a duration promised to everyone is accurate to nobody, and the quotation is the place where the number can actually be held to.
Does the price include installation, commissioning and training?
What is included is stated on the quotation line by line, along with what is quoted separately. Commissioning covers gauge checks against reference instruments, a dry run and the first valves through the full cycle; training, record templates and the spares register are part of handover. Ask for the split to be written on the quotation before signing — that is one of the twelve lines, and the cheapest place to settle it.
Can the configuration change after the order is signed?
The pressure envelope cannot — frame, cylinders and seals are sized for a pressure class, and that is mechanical, not a setting. Other items can change before the build freeze as change requests with their own quotation lines: an extra plate set, another PLC recipe, a different record format. After the freeze, the same changes usually mean re-work, which is why the survey stage and the enquiry list exist. Changes are cheapest at the quotation, more expensive before machining, and most expensive after delivery.
Why is there no price on the website?
Because a published number would be wrong for most readers in one of two directions: low enough to look competitive and then exceeded by the quotation, or high enough to be safe and hiding the smaller machine that was the right answer. Neither direction helps a buyer decide. What the site can carry is the structure of the quotation — the twelve lines above — so that when the number arrives, you can read it against what you actually asked for.
Valve types, DN bands, pressure classes, the standard on the order, the record your customer accepts, the automation level and the destination. The reply is a configuration and a quotation with every line filled in — not a number with nothing behind it.
For per-model coverage rather than the quotation structure, see valve test bench price by model.